We prepare and update safe work method statements (known in Poland as IBWR) for construction and installation contractors. We take account of the work method specified by the contractor, the equipment used and the conditions on site.
We identify hazards associated with the planned work and the measures that reduce the risk of accidents. We also set out when work should stop and what to do in an emergency.
We also review method statements prepared by subcontractors. We identify instructions that need revision and suggest specific changes.